|
|
Images of the Current Project
|
|
Instrument panel layout on paper prior to drilling and cutting the metal panel.
|
|
|
|
Very Carefully checking to be sure the wing is properly set, using a carpenter's level with a digital protractor backup.
|
|
|
|
Shots of the RV-7 sliding canopy version with a new AeroSport power specially built engine and Hartzell constant speed propeller.
|
|